February was a bit of a mess. I did not get much time to work on Red, and several tasks were up in the air until I sorted out the handlebar clamps. Now that those are done, I can move on a bit. I was still able to get a few small things done and spent a good bit of time working on the project this past weekend.
After the excellent gearbox workshop last month, I was able to get the driveline fully installed. It’s starting to look like a motorcycle again. There are parts of this work that would definitely benefit from a second set of hands, but I managed on my own. In the end, everything came together and it looks great. My one mistake, was forgetting to install the oil pressure sensor before hand. That little bugger is in a heck of a place to have to put in afterwards. It might have been easier to simply take it all apart again, but I was able to get it in eventually.




Discover more from Just a Bill
Subscribe to get the latest posts sent to your email.

Leave a Reply